See photos (6)
Arènes
Small rural heritage
,
Not rated
,
Arena
in Sarraziet
-
Adjacent to the multipurpose hall, the bullring was built in 1995, according to the plans of J.Labadie, certified in architecture, and inaugurated on 20/9/1997. The enclosure is composed of concrete bleachers, on three rows, surrounding the track. The official stand is located over the cow boxes. The band has a covered area, there is no Landes race without music. Around the dirt track, several wooden talanquères are installed to ensure safety. There is lighting on posts. Outside, on the...
Adjacent to the multipurpose hall, the bullring was built in 1995, according to the plans of J.Labadie, certified in architecture, and inaugurated on 20/9/1997. The enclosure is composed of concrete bleachers, on three rows, surrounding the track. The official stand is located over the cow boxes. The band has a covered area, there is no Landes race without music. Around the dirt track, several wooden talanquères are installed to ensure safety. There is lighting on posts. Outside, on the opposite side of the official stand, there is a refreshment stand cleverly hidden by removable panels.
The arena has a capacity of 600 seats, and can fulfill a multifunctional role: Landes races, festivals, Hay de Nadau, carnival or petanque tournaments.
-
-
Spoken languages
-
-
-
Accepted customers
-